Enter your developer hourly rate, the estimated
time for training
expenditure up to the productive use as well as an estimation
for the average time saving
through the use of iTech Logging
during all project phases (coding, testing, integration, start-up,
maintenance and future modifications).
A probable value for your training expenditure is 8h, the
maximum time required shoul not exceed 24h.
At the end of the calculation the results of the
ROI calculator will be displayed on screen an can be printed.
|